Page Drawings
21 Working Clearances
22 Point of Delivery Location
23 Overhead Meter Installation
24 Service Entrance Mast
25 1 Phase or 3 Phase Self-Contained Underground Meter Installation
26 Temporary 1 Phase Overhead Meter Installation
27 Temporary/Permanent 1 Phase Underground Meter Installation
28 Overhead Group Metering (Maximum 6 Meters)
29 Underground Group Metering (Maximum 6 Meters)
30 Consumer Owned Service Pole Installation
31 1 Phase Underground Metering (Design "A")
32 1 Phase Underground Mobile Home Metering and Service Pedestal (Design "B")
33 3 Phase Pole Mounted Meter Installation
34 Current Transformer - CT Metering Overhead Metering Equipment Transformers Mounted on Wall
35 Current Transformer - CT Metering Overhead Metering Equipment Transformers Mounted on Pole
36 Current Transformer - CT Metering (Transformers Mounted on Building)
37 Underground Current Transformer Metering Installation
38 Overhead 1 Phase Meter Base 120/240 Volt
39 Overhead 1 Phase Meter Base 120/240 Volt
40 Overhead 3W 3 Phase 5 Terminal Meter Base 240 or 480 Volt with 4th Wire
41 Underground 3W 3 Phase 5 Terminal Meter Base 240 or 480 Volt with 4th Wire
42 Overhead 4W 3 Phase 7 Terminal Meter Base
43 Underground 4W 3 Phase Meter Base 7 Terminal Meter Base
44 Transformer Rated Meter Base with Test Switch Compartment
45 Transocket (Rating Factor 3.0)
46 Wall Mounted Metering Transformer Enclosure Used Primarily to Enclose Metering Transformers
47 Metering Transformer Enclosure (Double Door)
48 1 Phase Overhead Meter Installation Pole Mount Above Flood Level w/ Platform
49 1 Phase Overhead Meter Installation Wall Mount Above Flood Level w/ Platform
50 Detail of Conduit Installation at Primary or Secondary Riser Pole
51 Concrete Pad Assembly for Three Phase Padmount Transformer
52 3 Phase Padmount Transformer Foundation and Barrier Detail
53 C.T. Meter Installation Underground
54 Pad Assembly For Single Phase Padmount Transformer
55 Clearance Requirement for Oil Filled Transformers at Building
56 Primary Trench Detail Conduit System
57 Minimum Requirements for Concrete Encased Conduit (2 Conduits- Radial Fee) (-1 Conduit -Loop Feed)
58 Minimum Requirements for Concrete Encased Conduit (Four Conduits)
59 Bell End Coupling Installation Conduit Terminations
60 Underground Road Crossing Detail